240 m²
01
Kynos Robotics
Motion Lab
Global Industrie
2024
Trade show · Paris
Every three years, INTERMAT brings more than 1,000 exhibitors of construction equipment and site solutions to Paris Nord Villepinte, indoors and outdoors. Stands are often very large, with imposing machines: they must combine equipment displays, client hosting and hospitality areas.
Next edition
21 to 24 April 2027 · Paris Nord Villepinte
in 5 months Time to get started
For a custom stand, start your project before 30 December 2026.
Dates checked on 25 September 2026 on the official website, organised by Comexposium. Rockstar Event is not the organiser of this show.
Free timeline
Get your personalised timeline: every deadline, from design to build-up, calculated from the show dates.
Sent! Your timeline is on its way by email. Here are the key steps:
The challenges
Our advice
On a large stand, create landmarks: architecture that signs the brand, areas by product range and comfortable hosting for meetings. Plan machine move-in with the organiser early.
Turnkey
We know the technical rules and constraints of Paris Nord Villepinte. You deal with one English-speaking contact, from first brief to breakdown.
Formats we build
Partner dinner or cocktail reception for your clients: our event agency in Paris designs it alongside your stand, with one project manager for both.
Projects
FAQ
INTERMAT 2027 takes place from 21 to 24 April 2027 (Paris Nord Villepinte). Dates checked on the organiser’s official website on 25 September 2026.
No: INTERMAT takes place every three years, in spring. After the 2027 edition (21 to 24 April 2027), the dates of the following edition have not been announced yet.
Design, build, installation and dismantling included, allow €18k to €48k excl. VAT for a 36 m² stand, €44k to €128k excl. VAT for a 100 m² stand and from €190k excl. VAT for a 500 m² stand. Floor space, charged per m² by the organiser, and its technical services (electricity, rigging) come on top.
For a custom stand, before 30 December 2026, 16 weeks before opening: enough time to design, get the plans approved by the organiser and build. A premium modular stand can be ready in 6 to 8 weeks.
Yes. We design and build stands of several hundred square metres, with structures, client areas and large-format signage.
Yes: structures suited to the open air, floors, tents or pavilions, taking wind and safety rules into account.
Explore