Trade show planning timeline: when to prepare your exhibition stand

From six months out to dismantling, the key steps and the right lead times to prepare your trade show in France calmly, including the steps specific to exhibitors coming from abroad.

Floor plan on a work table

A successful trade show is won months before the doors open. Booking the space, designing the stand, the technical paperwork and your communication all follow one another. Here is the timeline we recommend to our clients for a custom stand, with the extra steps for companies exhibiting in France from abroad.

Six months out: decide and book

  • Set your goals: number of meetings, leads, launches, brand image.
  • Book your space: the best locations go early, especially corners and main aisles.
  • Set an overall budget (space, stand, technical services, travel). Our guide to exhibition stand costs in France gives the ranges.
  • Coming from abroad? Book hotels now: during the largest Paris shows, rooms near the venues sell out and prices climb fast.

Four months out: brief your stand builder

  • Share the floor plan, the show’s technical regulations and your goals.
  • Specify how the stand will be used: demos, meetings, hospitality, storage.
  • Share your brand guidelines and the content you already have.

Three months out: approve the design

Presentation of the concept and 3D renderings, adjustments, then approval of the final budget. This is the time to decide: every later change has a cost and an impact on the schedule.

Ten weeks out: the technical file

  • Construction drawings and safety file sent to the organiser.
  • Approval by an accredited inspection body for the structures that require it, such as double deck stands.
  • Technical orders: electricity, rigging, water, internet.

Eight weeks out: production

Production starts in the workshop: joinery, painting, metalwork, printing. Content (visuals, videos, copy) must be final no later than three weeks before the show.

If you ship products or demo equipment from outside the European Union, now is the time to arrange your freight forwarder and your customs documents, such as an ATA carnet for temporary admission.

Six weeks out: communication

  • Invite clients and prospects and book meetings in advance.
  • Social media and press relations.
  • Prepare your team: attendance schedule, key messages, outfits. Plan French versions of your key documents: visitors appreciate it.

Two weeks out: pre-build

We pre-build the stand in our workshop to check every detail: finishes, lighting, screen integration. It is the best insurance against surprises on site.

Five days to one day out: build-up

Transport, installation by our crews, lighting and content settings, technical handover. The stand is delivered clean the day before opening.

Show days and after

  • Technical support throughout the show.
  • Dismantling as soon as the show closes, then storage and reconditioning of the stand.
  • Review one month later: leads, meetings, team feedback, improvements for the next edition.

The most underestimated lead time? Internal approval of the design. Build your decision making into the schedule.

What if the show is in six weeks?

It can be done, with a premium modular stand or an existing stand that is reused and redressed. Contact us right away: we will tell you honestly what is feasible. Planning your first show in France? Read our guide for international exhibitors and check the trade show calendar.

Frequently asked questions

How far in advance should you prepare a trade show?

Six months ahead to book the space and set the budget, four months ahead to brief your stand builder, and three months ahead to approve the design. Exhibitors coming from abroad should also plan shipping, customs and hotels early.

Can a stand be built in six weeks?

Yes, with a premium modular stand or an existing stand that is reused and redressed. A fully custom stand needs more time for design, approvals and workshop production.

A trade show, a launch, an event in France?

Your next trade show deserves a standing ovation.

Tell us about your project in two minutes. An English-speaking project manager gets back to you within 48 h (business days) with a first creative and budget approach.

Request a quote

Before you leave the stage…

  • Stands · events · showrooms
  • From €5k excl. VAT
  • Reply within 48 h

Get your free estimate.

Project, industry, email: that is all. An English-speaking project manager sends you a budget range and creative ideas for your project within 48 h.

Tell us about your project.

Choose your industry.

Required field.

Enter a valid email address.

Please agree so we can send you your estimate.

Prefer to talk? +33 6 08 54 12 63