Groupe Maëlis
Suite Signature
A full-size show suite, reinstalled in the hotel after the show.
The brief
Groupe Maëlis was presenting its new room concept for its 4 and 5-star hotels at EquipHotel. Rather than a stand, it needed a real suite that specifiers and investors could walk through to experience the materials, the light and the comfort.
The idea
A complete 45 m² suite (bedroom, bathroom, lounge), wrapped in a reception lounge. Everything is built to hotel standards so it can be dismantled and reinstalled in the group’s pilot hotel after the show.
Production
Walnut and lacquer joinery, upholstered headboard, bathroom with working plumbing, home automation lighting. Built in our workshop to hotel requirements: acoustics, fire rating, durability.
Timeline · 10 weeks
- W-10Brief & pilot hotel survey
- W-8Drawings & material sampling
- W-6Fabrication to hotel standards
- W-2Pre-assembly & inspection
- W-1Build-up (3 days)
- DShow opens
- D+5Breakdown & refurbishment
- D+15Reinstallation in the pilot hotel
Installation
Three days of build-up at the show, then breakdown, refurbishment and reinstallation in the pilot hotel in six days.
Our investors could literally sleep in the future concept. No 3D rendering could have had that effect.
A similar project?
Exhibiting at EquipHotel or a similar show? Tell us about your project: we reply within 48 h with a first approach and a budget range.
Team on the project
Next project · Fondation Iris
Deep Lights →